Despite challenging conditions, the commissioning of our STEMA® rail stamping machine at Jindal Steel was successfully completed.

During commissioning, an unexpected incident occurred in which a rolled section collided with the STEMA®. Despite the considerable impact, the machine’s main components remained fully operational, demonstrating the robustness and reliability of our equipment. Following a brief repair, commissioning was able to continue as scheduled.

With the successful Final Acceptance, Jindal Steel confirmed its acceptance of the machine.

We would like to thank Jindal Steel and our partner Pomini for the trusting and successful cooperation.

YouTube

Mit dem Laden des Videos akzeptieren Sie die Datenschutzerklärung von YouTube.
Mehr erfahren

Video laden